<aside> 🚦 Before moving from one Canon to the next, run this checkpoint. 60-90 minutes.

</aside>

Objective: Provide a structured decision process for moving from one Canon to the next so the team does not advance with unvalidated assumptions or incomplete work.

When to use: When the team believes they have met the exit criteria for the current Canon. Typically 60-90 minutes.

Inputs: Canon exit criteria documentation, Playbook with current state, evidence for each criterion, risk assessment of proceeding vs. staying.

Position: Architect presents evidence. Guide confirms Playbook status. Sentinel flags risks. Sponsor makes the call.


Criteria Review (20 min)

Architect presents evidence that Canon exit criteria are met.

Playbook Status (10 min)

Guide confirms Playbook reflects current reality.