<aside> 🚦 Before moving from one Canon to the next, run this checkpoint. 60-90 minutes.
</aside>
Objective: Provide a structured decision process for moving from one Canon to the next so the team does not advance with unvalidated assumptions or incomplete work.
When to use: When the team believes they have met the exit criteria for the current Canon. Typically 60-90 minutes.
Inputs: Canon exit criteria documentation, Playbook with current state, evidence for each criterion, risk assessment of proceeding vs. staying.
Position: Architect presents evidence. Guide confirms Playbook status. Sentinel flags risks. Sponsor makes the call.
Architect presents evidence that Canon exit criteria are met.
Guide confirms Playbook reflects current reality.